岳的又肥又大又紧水有多视频,欧美91精品国产,人妻夜夜爽天天爽一区,色五月开心五月无码AV,精品久久久久久国产,风流老熟女一区二区三区,国产精品久久国产三级国,亚洲精品无AMM毛片

CN EN
Market News
National Energy Board will implement the new energy grid Deal
Time:2013-02-17

The new energy industry will usher in a new positive. "Renewable energy power priority access management approach" is being used by organizations to develop the National Energy Board, which will focus on ways to solve the power problem is difficult to purchase all the wind power and solar energy, etc. In addition, the industry's long-awaited "renewable energy quotas management approach "will also choose the introduction. 

In addition to the grid, the National Energy Board also amended to adjust the installed capacity target of "renewable energy" second five "plan" for solar power, up from 21 GW to 35 GW. 

Grid Deal 

Wind power and solar power has always been there and the difficult problem of network. 

SERC last August release of "key areas of wind power consumptive regulatory reporting," pointed out that the current national focus on the area of wind power "abandoned wind" is getting worse, where the north, northwest and northeast where the "Three North" region and net installed Although the capacity and power generation accounts for more than 85% of the country, but abandoned the year 2011 amounted to 12.3 billion kwh of wind power, electricity corresponding loss of about 6.6 billion yuan. 

Here, there are data that the current "Three North" region and the Inner Mongolia region and some wind farms have not been accepted or abandoned wind power reached 20%. 

Not only is wind, solar and net situation is not optimistic. A reporter recently acquired information and data, as of the first half of 2012, 2009 and 2010, Golden Sun project directory, the main project is completed and approved the project network project 106, the main project is not completed and the network project 44. 

From this perspective, grid projects accounted for 71% of completed projects, and network situation is more optimistic. However, sources close to the related statistics, told reporters that the grid project divided into two cases, one is an official with the State Grid and Project Network license file, there is no such document, but a business on their own projects and networks "But very few of the former, in accordance with the actual meaning of the grid, is to be accepted into the national grid and the grid system of electricity generation as circumstances permit, and no more than 10 projects, 90% or more of the project did not achieve real Grid sense. 

For reasons difficult and networks, a Bureau of Energy said that the presence of three main issues, namely market space problems, one is conveying path problem, but also a run and subsidies. "Take wind power, if developments in the case of existing power system is not changed, the industry market space utilization has been completed, if not make changes on the institutional mechanism, there would be no room for development of wind power, even change the pattern, as well as the southern point of space , also have developed over two years, so the market problem is the question of changing the institutional mechanisms. "these people said. 

In this regard, the sources said, this year's Energy Bureau plans to add wind power installed capacity of 18 million kilowatts, and in 2009-2012 the planning of new installed capacity is 15 million kilowatts, "the capacity of the previous plan is to start this year to is the result, look at the actual grid. "

According to the source, at present, the Northeast region, Inner Mongolia, northwest region, including North China's Zhangjiakou and Chengde transport corridor problem exists, "I will not speak to coordinate uncoordinated, these areas are not enough transmission capacity, we first have to solve the transmission bottleneck off. "


Back
主站蜘蛛池模板: 上思县| 满洲里市| 皮山县| 郸城县| 诏安县| 怀仁县| 阿克苏市| 英德市| 平顺县| 桃江县| 阜宁县| 简阳市| 自治县| 波密县| 赤峰市| 资兴市| 许昌市| 白山市| 临沭县| 榆树市| 肥乡县| 曲阳县| 贡山| 五峰| 行唐县| 通渭县| 聂荣县| 舒城县| 交城县| 越西县| 高唐县| 贺兰县| 长垣县| 行唐县| 焦作市| 化州市| 汽车| 沅江市| 揭东县| 综艺| 泸西县|